01204 395955
email sales@wpluk.com
To design, supply and install a Decorative Aluminium Mesh cladding system to the complex rooftop area.
Rooftop screening with a minimum visual area of 28% and maximum free area of 75% to the perimeter of the MSCP with a purpose built support system, folded corners and matching flashing.
wpl-DM/EX-Ackroyd
The Harris Partnership
Marshall Construction
Inspired by this project? Then give our Technical Sales Team a call on 01204 395955 to discuss options for your next project.
© WPL (UK) Ltd 2024
All rights reserved. Company registration number: 04418647